Development Journey

7 Months ofInnovation

From concept to MVP: The complete development roadmap of FloorPlan-X

Development Roadmap

7 months of strategic development from MVP to production-ready product

Month 1

Cleaning Up & Making Rules

Foundation & Standards

  • Code audit and technical debt analysis
  • Define v2 JSON data schema
  • Feature requirement documentation
  • System architecture planning

Deliverables: Architecture document, Data format specification, Clear feature roadmap

Month 2

Making the AI Actually Good

Model Enhancement & Optimization

  • Collect 5,000+ Indian floor plan training data
  • Train separate AI models for walls, doors, rooms, and furniture
  • Optimize model to ONNX format for faster processing
  • Achieve 90% wall accuracy and <1.5s processing time

Deliverables: Production-ready AI model, Accuracy report, Performance benchmarks

Month 3

Making the 3D Look Professional

Visual Enhancement & UX

  • Implement realistic wall geometry and door/window cutouts
  • Add professional lighting and shadow rendering
  • Integrate 500+ furniture and appliance models
  • Optimize for 60 FPS on standard laptops

Deliverables: Professional 3D engine, Asset library, Browser compatibility tests

Month 4

Plumbing & Electrical (The Cool Stuff)

MEP System Generation

  • Generate intelligent plumbing layouts with hot/cold water
  • Create electrical wiring and circuit layouts
  • Implement conduit and switch placement algorithms
  • Add disclaimer and reference-only disclaimers

Deliverables: Plumbing generation engine, Electrical layout system, Toggle views

Month 5

Let Users Fix Our Mistakes

Interactive Editing & Cloud Storage

  • Build JSON editor for advanced users
  • Implement drag-and-drop furniture editing
  • Create room type and dimension editor
  • Setup cloud storage with version control and multi-format export

Deliverables: Full editor suite, Cloud integration, Permission system

Month 6

Testing Everything

Quality Assurance & Performance

  • Unit tests for AI components and 3D conversion
  • Integration tests across all features
  • Stress tests for large floor plans and concurrent users
  • Security audits and browser compatibility tests

Deliverables: Automated test suite, Security report, Performance benchmarks

Month 7

Shipping It

Final Polish & Launch

  • Complete documentation and API reference
  • Create 5 demo projects with real Indian houses
  • Develop marketing materials and pitch deck
  • Setup monitoring, alerts, and customer support

Deliverables: v2.0 release, Documentation, Demo projects, Marketing assets

Success Metrics

AI Accuracy

90%+

Wall detection accuracy

Processing Time

<3s

End-to-end floor plan processing

Performance

60 FPS

3D rendering on standard laptops